On-Site Server Installation Options
|
On-Site
Installation Options
|
|
Key
Features
|
Server
& NOS Installation
|
Server
Installation
|
Basic
Server Set-up
|
Rack
Mounting
|
Rack
Installation
|
|
Unpack
product &remove packaging to customer-designated area within the building
|
|
|
|
|
|
|
Conduct
external quality inspection
|
|
|
|

|
|
|
Conduct
internal quality inspection
|
|
|
|
|
|
|
Connect
server into existing network
|
|
|
|
|
|
|
Connect
peripherals (monitor, mouse, keyboard) to server
|
|
|
|
|
|
|
Verify
factory-installed NOS (Network Operating System)
|
|
|
|
|
|
|
Install
NOS on-site
|
|
|
|
|
|
|
Set-up
print queue
|
|
|
|
|
|
|
Establish
5 user logins (server & clients)
|
|
|
|
|
|
|
Run
hardware diagnostics
|
|
|
|
|
|
|
Mount
server into supported rack
|
|
|
|
|
|
|
Install
rack
|
|
|
|
|
|
|
Mount
peripherals (monitor, mouse, keyboard, UPS, PDU) into rack
|
|
|
|
|
|
|
|